RAF Brize Norton, Carterton

RAF Brize Norton, Carterton

Project Particulars
  • Client: DCRE (Deputy Commander Royal Engineers)
  • Architect: DCRE
  • Form of contract: GC Works 1 (Edition 3, 1991)
  • Value: £475,000
  • Duration: 36 weeks
Scope of Works
  • Provision of safe working environment, welfare facilities and site office, all in compliance with CDM Regulations 2007
  • Electrical installation work of heating and other electrical building equipment
  • Building alteration work and construction work for multi-dwelling military buildings and installations
  • Painting, decorations and refurbishment of 49 bedrooms
  • Water heaters, heating & plumbing equipment
  • Replacement of all windows
  • New Fire doors and frames with intumescent strips to all rooms
  • Complete re-fit of ablutions rooms including minor demolition works, new shower cubicles, new baths and toilets
Northwood Headquarters, Northolt

Northwood Headquarters, Northolt

Project Particulars
  • Client: Carillion PLC
  • Architect: Caledonian Building Systems
  • Form of contract: DOM 2 with amendments
  • Value: £760,000
  • Duration: 36 weeks
Scope of Works
  • Caledonian Building Systems Limited provided residential accommodation in the form of off-site constructed modules which required the following roofing works upon their installation at Northwood Headquarters:
  • Art Contracts Limited provided the Installation of:
  • Prefabricated “line load” galvanised steel truss system onto 150x50mm SW wall-plates
  • Standing seam roof coverings
  • 3 Layer felt roofing system
  • Bespoke aluminium perimeter detailing
  • Aluminium rainwater goods
  • Roof compartment fire barriers